| (All
fields are required) |
|
Contact
Information
|
| Your Name |
|
|
| Title |
|
|
Area of Responsibility |
|
|
| Landfill, Municipality
or Company |
|
|
| Address |
|
|
| City,
State |
|
|
| Zip Code |
|
|
| Telephone |
|
|
| Fax |
|
|
| E-Mail |
|
|
| |
|
About Your Custom Analysis
|
How should we send it to
you? |
|
|
Choose a currency |
|
|
Choose a measurement system |
|
|
|
|
Basic
Parameters
of Site Needing Coverage |
Average size
of working face |
|
sq. feet or sq. meters |
Number of weeks/year
site operates |
|
weeks/year |
Number of days/week
site operates |
|
days/week |
Hourly labor rate for worker
to apply ADC |
|
|
Cost of diesel
fuel |
|
per gallon or liter |
Would you use CAPS machine
and product to plant seed? |
|
|
Cost
of treating leachate (transportation and treatment costs) |
|
per gallon or liter |
|
|
Basic
Parameters of Compaction, Amount of Soil Used, Etc. |
In-place
specific waste
or density
|
|
lb./cu. yd. or
kg./cu. m. |
In-place
specific waste or density: This is the weight of a cubic yard or cubic
meter of solid waste after it has been placed in the landfill and compacted. It
ranges from 900 to 1800 lbs./cubic yard (449 to 897 kg./cubic
meter).
The average is 1100 lbs./cubic yard (548 kg./cubic meter).
|
Estimated tipping
fee
or cost
to build a cubic yard
(cubic meter)
of landfill space |
|
|
Tipping
Fee: If you have
a layered tipping fee, use
your average fee per ton for municipal solid waste.
Cost per cubic yard (cubic meter): If you have no tipping fee,
determine
the cost to build a cubic yard or cubic meter of landfill space.
|
| |
|
Basic Parameters of
Collecting, Moving and Applying
Soil As Daily Cover |
Daily hours of operation
of a scraper and all other
equipment needed for soil
stockpiling and collection |
|
hours
|
Daily hours of operation of heavy equipment for soil placement as daily cover |
|
hours
|
Cost of stockpiling soil
|
|
|
Cost of stockpiling soil: This is the cost per hour for operating an excavator
and other equipment including labor, fuel, maintenance and depreciation. The
average cost per hour to operate an excavator in the U.S. is $57/hour.
|
Cost of applying soil
|
|
|
Cost of applying soil: This is the cost per hour for operating
equipment to apply daily cover including labor, fuel, maintenance and depreciation.
The average cost per hour for application in the U.S. is $37/hour.
|
Cost of purchasing soil if necessary |
|
per cubic yard or meter
|
| |
|
|
|